Introduction to Prior Approval vs Planning Permission UK
If you’re looking to make changes to a property in the United Kingdom, you will frequently encounter two crucial terms: prior approval and planning permission. Understanding the differences between prior approval vs planning permission UK can save you time, money, and complications during your development project. Whether you’re a homeowner, property developer, or planning consultant, a clear grasp of these two processes is essential for legal compliance and project success.
What is Planning Permission in the UK?
Planning permission is formal consent from your local planning authority (LPA) to carry out building works or significant changes to land or buildings. The purpose of planning permission is to control development in a way that balances various interests, including sustainability, local amenities, infrastructure, and environmental impact.
Typical scenarios that require planning permission include:
- Building a new house or structure.
- Changing the use of a building (e.g., from commercial to residential).
- Carrying out large extensions or outbuildings.
- Altering listed buildings or properties in conservation areas.
Local planning authorities assess applications based on the National Planning Policy Framework (NPPF), local plans, and other relevant guidance.
What is Prior Approval?
While planning permission is a broad regulatory process, prior approval is a more specific consent mechanism in the UK planning system. It applies to particular types of permitted development—works that generally do not require full planning permission but must still be assessed for limited impacts.
Prior approval schemes are governed by the Town and Country Planning (General Permitted Development) (England) Order 2015 and its subsequent amendments. These orders lay out classes of development that can proceed without full applications but may be subject to conditions involving prior approval.
Key works requiring prior approval may include:
- Larger home extensions that go beyond typical permitted tolerances.
- Conversions of agricultural buildings to residential use (Class Q).
- Change of use from office to residential (Class O, now replaced by Class MA in England).
- Additions of storeys to existing dwellings.
- Telecommunication masts, solar panel installations, and other infrastructure projects.
The local authority’s role under prior approval is typically more restricted, considering only specific issues such as transport impact, flooding, or neighbour amenity, rather than the full range of planning considerations.
Key Differences: Prior Approval vs Planning Permission UK
| Aspect | Prior Approval | Planning Permission |
|---|---|---|
| Scope | Restricted to specific types of permitted development. | Covers all forms of development and change of use unless exempted. |
| Assessment Criteria | Local authority can only assess set issues (e.g., noise, transport, flood risk). | Full range of planning policies, environmental, aesthetic, and community factors considered. |
| Timescales | Decisions usually required within 28 to 56 days (varying by development type). | Standard decision period is 8 weeks (minor development) or 13 weeks (major development). |
| Neighbour Consultation | Required for certain prior approval schemes, often limited in scope. | Wider public consultation, including site notices, letters, and online publication. |
| Application Complexity | Usually simpler, requiring basic plans and statements covering specific impacts. | Frequently extensive, with full architectural plans, supporting surveys, and policy analysis. |
| Fees | Generally lower than full planning fees (e.g., £96-£206, as of 2024). | Fees vary by project size and type, usually higher (e.g., from £234 for householder to thousands for major schemes). |
| Appeal Rights | Appeal possible if prior approval is refused or not determined in time. | Applicants may appeal refusals, conditions, or non-determination. |
When is Prior Approval Needed?
Not all permitted development is free from local authority involvement. Prior approval is specifically required when national policy recognizes potential impacts but has deemed these controllable and limited. The prior approval process gives councils a chance to safeguard local interests while enabling a more efficient route for developers.
Examples where prior approval is mandatory include:
- Larger Home Extensions: Under Class A of the GPDO, single-storey rear extensions to certain depths can proceed without planning permission—but only if the council is notified and neighbours do not raise valid objections.
- Office-to-Residential Conversions: The conversion of office space to residential use under Class MA requires prior approval to assess matters like transport, flooding, contamination, and the impact on local businesses.
- Barn Conversions: Transforming agricultural buildings into dwellings or flexible commercial use requires a detailed prior approval application, with considerations for highways, contamination, noise, and design.
When Do You Need Full Planning Permission?
Full planning permission is required for:
- New builds on undeveloped land.
- Major extensions outside GPDO limits (beyond the restrictions in permitted development rights).
- Work involving listed buildings or significant changes in conservation areas.
- Substantial change of use (unless allowed as permitted development).
- Flats or maisonettes (permitted development rights are often excluded).
- Where local planning authorities have removed permitted development rights using Article 4 Directions or planning conditions.
Applying for planning permission involves preparing comprehensive plans and documents, submitting a formal application, and going through the full public consultation and assessment process.
How Does the Prior Approval Process Work?
The process for obtaining prior approval under UK law is generally as follows:
- Determine eligibility: Confirm that your project falls within the applicable class of permitted development requiring prior approval under the GPDO.
- Prepare your submission: Gather plans, supporting statements, and evidence for criteria the authority will consider (such as noise, transport, or flooding).
- Submit application: Send your documents, fee, and any required notices to the local planning authority.
- Consultation and publicity: In many cases, the authority will notify immediate neighbours and other statutory bodies.
- Assessment: The local authority will only consider the points specified in the relevant part of the GPDO.
- Decision: The council must respond within a prescribed timeframe (typically 28 or 56 days depending on the class).
- Outcome: If approved or the authority fails to respond in time, the proposal may proceed. If refused, you may appeal.
Importantly, if the authority misses the decision deadline and does not issue a refusal, the applicant can often proceed by default.
How Does the Planning Permission Process Work?
A summary of the planning permission process in the UK:
- Pre-application Advice: Many applicants seek advice from the LPA before submitting, especially for complex projects.
- Submit Application: Complete forms, submit